Page 11 - GETELEC - Products and solutions Catalog
P. 11

D   USAGE REQUIREMENTS


                      16  I.P. sealing
                         • Dripping
                         • Projection
                         • Immersion
                         • Dust
                      17  Is the system pressurised? To what pressure? With what gas?

                      18  Nature of mounting and surface protection.

                      19  Galvanic compatibility.
                      20  Positioning of product.

                         • Time planned for positioning product
                         • Accessibility of mounting
                         • Manual placement
                         • Automatic placement
                         • Adhesiveness of product
                      21  Frequency of opening and closing the equipment.

                         • Is the sealing system changed every time it is opened?



                      E   FINANCIAL CONSTRAINTS

                      22  Planned budget for sealing and shielding.

                      23  Number of systems to be built? At what rate?

                      24  Impact of these requirements on the system's functionality.
























                                                                                                                   11
   6   7   8   9   10   11   12   13   14   15   16