Page 11 - GETELEC catalogue US 2020
P. 11

D   USAGE REQUIREMENTS

                 16  I.P. sealing

                    • Dripping
                    • Projection
                    • Immersion
                    • Dust

                 17  Is the system pressurised? To what pressure? With what gas?
                 18  Nature of mounting and surface protection.

                 19  Galvanic compatibility.

                 20  Positioning of product.
                    • Time planned for positioning product
                    • Accessibility of mounting
                    • Manual placement
                    • Automatic placement
                    • Adhesiveness of product
                 21  Frequency of opening and closing the equipment.

                    • Is the sealing system changed every time it is opened?



                 E   FINANCIAL CONSTRAINTS

                 22  Planned budget for sealing and shielding.

                 23  Number of systems to be built? At what rate?

                 24  Impact of these requirements on the system's functionality.

















                                                                                                                   10
   6   7   8   9   10   11   12   13   14   15   16